2.
Connection Configuration
Power Synchronized Connections
Powering on sequence
1
Power on of all the server UPS units
2
Server startup
The server OS startup is suspended until the ETERNUS AF startup is complete (*1).
3
Issuance of command to turn on the ETERNUS AF from the power synchronized unit
4
ETERNUS AF startup
*1: The server must be set to suspend server OS startup until the ETERNUS AF startup is complete.
Powering off sequence
1
Shutdown of all the servers
2
Shutdown of all the server UPS units
3
Issuance of command to turn off the ETERNUS AF from the power synchronized unit
4
ETERNUS AF shutdown