Setting Operation Switches Enabled - Pro-face GP2000H Series User Manual

Pro-designer compatible
Hide thumbs Also See for GP2000H Series:
Table of Contents

Advertisement

Chapter 3 – Handling and Wiring
3. Securely attach the GP unit's installa-
tion gasket.
4. Bend the cable to fit inside the GP unit's
cable channel, and adjust the cord guard
to fit securely into the GP unit's plastic
casing.
5. Replace the cable cover and securely
tighten all seven (7) attachment screws.
A torque of only 0.5 N•m is sufficient
to tighten these screws.
To reattach the cable cover, securely fit
the installation gasket around the cable,
and fasten the cable cover to the GP unit
(see diagram, right).
Be sure that the installation gasket and the cable cover are securely
fastened. Incorrect alignment of these parts can lead to water leakage
and may result in damage of the GP unit.

3.3.3 Setting Operation Switches Enabled

This setting can be done on Pro-Designer.
However, the cable must be wired as shown in the figure below to set it correctly.
The factory setting is as the figure below.
3–8
GP2000H
unit's Gasket
Cable Cover's
Cable
GP2000H
unit's Gasket
3-Position Enable
Switch cover
Wire the cable
here!
(Connector for the
GP2000H Unit)
GP2000H Series User Manual
Gasket

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gp-2301hlGp-2301hsGp-2401ht

Table of Contents