Tools And Equipment - Cisco ASR-920-8S4Z-PD Hardware Installation Manual

Aggregation services router
Table of Contents

Advertisement

Tools and Equipment

Tools and Equipment
You need the following tools and equipment to install and upgrade the router and its components:
• ESD-preventive cord and wrist strap
• Antistatic mat or antistatic foam
• Number 1 and Number 2 Phillips-head screwdrivers
• #12-24 pan-head screws to secure the router to the equipment rack
• Cables for connecting to the network ports (depending on the configuration)
For more information about cable specifications, see the
• Ethernet hub, switch, or PC with a network interface card for connecting to the Ethernet ports
• Console terminal (an ASCII terminal or a PC running terminal emulation software) that is configured
• Console cable for connecting to the console port
• Ratcheting torque screwdriver with a Phillips head that exerts up to 30-pound force per square inch (in-lb)
• Crimping tool as specified by the ground lug manufacturer
• Wire-stripping tools for stripping both 6-AWG and 14-AWG wires
• Tape measure and level
Warning
Only trained and qualified personnel should be allowed to install or replace this equipment. Statement 49
Cisco ASR 920-10SZ-PD and Cisco ASR-920-8S4Z-PD Aggregation Services Router Hardware Installation Guide
28
for 9600 baud, 8 data bits, no parity, no flow control, and 1stop bit
or 0.02-kilograms force per square millimeter (kgf/mm2) of pressure
Troubleshooting
section.
Preparing for Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asr-920-10sz-pd

Table of Contents