E - OPERATOR MANUEL
6 - PREPARATIONS BEFORE WELDING ON CONTROL UNIT
NB: FOR THE CONTROLS OF D2C SAW SEE INSTRUCTIONS 8695 6051
MANUAL CONTROLS
wire feed up
wire feed down
hight wire feed speed.
flux supply
PREPARATION
Adjust the position of wire lead in with the slides
Make sure that the flux reserve into the tank is sufficient to cover totaly the welding lay.
DOES NOT OPERATE WITH THE ALTERNATING CURRENT GENERATORS.
If C18 is in position
Feed wire to do contact with the workpiece
During wire feed, the display unit U P9 displays a value, as soon as the electric contact with the
part is detected, the display unit displays 0 and wire feed stops.
Pre-adjustment of V and A parameters
Press on P12, parameters V and A are displayed
Modify P1 and P5 to adjust the required values
E-40
:
8695 5240 / M
SUBARC 5 - DX7