F - Maintenance; Servicing - Lincoln Electric SUBARC 5 Instructions For Use And Maintenance Manual

Automatic resurfacing and welding installation by submerged arc
Table of Contents

Advertisement

F - MAINTENANCE

1 - SERVICING

 So that the machine continues to provide good service for as long as possible, a certain minimum of care and
maintenance is necessary
 The frequency of this maintenance work is given on the basis of the production of one work station per day.
Maintenance should be more frequent if production is greater.
Your maintenance department may photocopy these pages so that it can follow up maintenance dates and
Blow inside the sheaths, the wire guides on plate inlet and outlet, the wire feed plate, the extension
joining pieces and the wire straightener.
Check the wire nozzles for wear.
Date of maintenance:
Démonter le couvercle du recyclage flux, le retourner et le secouer énergiquement pour évacuer
les "fines" et la poussière.
Démonter et secouer efficacement la manchette tissu du couvercle de ensemble de recyclage flux
Souffler l'intérieur de la vannes à flux, des tuyaux, de l'amenée de flux.
Date of maintenance:
Dismount the cover of the flux recycling device, turn it upside down and shake it energetically to
remove the "fines" and dust.
Dismount and shake well the tissue oversleeve of the flux recycling unit.
This operation should be carried out with the installation powered down and after having removed
the side panels of the power source.
F-44
operations (tick as appropriate)
On each wire spool replacement
/
/
Hebdomadaire
/
/
Daily
8695 5240 / M
SUBARC 5 - DX7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dx7

Table of Contents