Lincoln Electric SUBARC 5 Instructions For Use And Maintenance Manual page 31

Automatic resurfacing and welding installation by submerged arc
Table of Contents

Advertisement

8695 5240 / M
In the power unit:
- Remove the cover of the power unit by unscrewing the 4 screws item A11.
- Insert into the power unit through the grommet item A9
 all the cables coming from the welding head (except welding cables)
 the supply cable delivered with the installation (If more length is required, use a
3x2,5 mm² cable)
 the control harness previously connected to the power source
- Anchor these cables by inserting them between the metallic rods item A10
CYCLE BOARD SIDE item C6:
- Connect the console cable to J6, J9 and J10 of the cycle board.
- Connect the cable for arc voltage measurement to J11 of the cycle board.
- Connect the control cable of the power source to J15 of the cycle board.
(for a STARMATIC 800AC)
- Connect the wires of the tacho generator to connector J1 (item: 8 and 9) shield rep10
of the variable speed unit C7.
- Connect the control cable of the power source to J2 of the cycle board.
TRANSFORMER SIDE:
- Connect the wires of the cable of the wire feed motor to terminals 20 and 21.
- Fit solenoid valve F18
- Connect the wires of the solenoid valve cable to the fuse holders F7 and to terminal 16.
- With valve option for recycling, connect the wires of the recycling solenoid valve cable
to fuse holder FU8 and to terminal 16.
- Connect the feed wires to terminals L1-L2 and the green/yellow wire to the
equipotential connecting copper rod
- Connect the feed wires to terminals L3-L4 and the green/yellow wire to the
equipotential connecting copper rod
- Adjust coupling of transformers TR1 and TR2 according to the mains voltage.
SUBARC 5 - DX7
D - ASSEMBLY CONNECTION
D-25