NOTE:
Before working inside your Embedded Box PC, read the safety information that shipped with your Embedded Box
PC and follow the steps in
follow the steps in
After working inside your Embedded Box
Compliance home page at www.dell.com/regulatory_compliance.
Topics:
•
Procedure
•
Post-requisites
Procedure
1. Replace the
power
switch.
2. Place the top cover on the chassis and align the screw holes on the top cover with the screw holes on the chassis.
3. Replace the screws that secure the top cover to the chassis.
4. Replace the hexagonal screws that secure the VGA port to the top cover.
5. Route the power-switch cable through the routing guides on the chassis.
6. Connect the power-switch cable to the connector on the system board.
Post-requisites
1. Replace the
power
connectors.
2. Replace the
riser
card.
3. Replace the
CANbus
cable.
4. Replace the
PCI/PCIe card
5. Follow step 2 to step 8 in
"Replacing the back
82
Replacing the top cover
Before working inside your Embedded Box
(if necessary).
cover".
Replacing the top cover
PC. After working inside your Embedded Box PC,
PC. For more safety best practices, see the Regulatory
48