Checklist For Periodic Inspection And Maintenance - DeDietrich MCA Pro 45 Installation And Service Manual

Wall-hung gas-fired condensing boilers
Table of Contents

Advertisement

10. Checklists

10.2 Checklist for periodic inspection and maintenance

No.
Inspection and/or service activities
1
Checking the system pressure
(Recommendation: 22 - 30 psig / 1.5 - 2 bar)
2
Checking the tightness of the flue gas venting and air
inlet connections
3
Checking the automatic air vent
4
Checking the safety valve
5
Checking the siphon
6
Checking the ionization current
7
Checking the burner and heat exchanger (heating
system)
8
Inspection of the ionization electrode/ignition electrode
9
Assembling the boiler (Replace all removed gaskets)
10
Filling and refitting the siphon
11
Checking combustion (CO
12
Number of operating hours
13
Number of successful starts (%)
14
Service message deleted or service indicator reset
15
Maintenance kit A, B or C used
16
Boiler visually inspected
17
Extra maintenance work that was undertaken
18
Check the water chemistry
19
Confirmation of inspection
Date
Company name, signature of engineer
114
) (Full load/Part load)
2
MCA Pro 45/65/90/115
Confirmation and date
(dd-mm-yy) (dd-mm-yy) (dd-mm-yy) (dd-mm-yy) (dd-mm-yy)
MCA-Pro ISM Rv.4.1 2/2017

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mca pro 90Mca pro 115Mca pro 65

Table of Contents