10. Checklists

10.1 Checklist for commissioning

No.
Work to be undertaken for commissioning
1
Filling the heating system with water and checking the water pressure
2
Fill the siphon with water
3
Vent the air in the heating system
4
Checking the water-side connections for tightness
5
Checking the type of gas supplied. Checking that the boiler is suitable for the gas supplied?
6
Checking the gas supply pressure
7
Checking the capacity of the gas meter
8
Checking the tightness of the connections and the gas pipes
9
Purge the gas supply pipe of the boiler
10
Checking the electrical connections
11
Checking the air supply connections and flue gas discharge connections
12
Checking the functioning and operational status of the boiler
13
Checking the air/gas ratio
14
Remove the measuring device and close the measurement points
15
Correctly fit the front housing of the boiler
16
Attaching the Gas Type sticker
17
Set the room thermostat or the regulator
18
Instruct the user and hand over the necessary documents
19
Fill in the warranty card together with the user
20
Confirmation of commissioning
Date
Company name, signature of engineer
MCA-Pro ISM Rv.4.1 2/2017
MCA Pro 45/65/90/115
Attachment / Measured
values
(dd-mm-yy)
113

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mca pro 90Mca pro 115Mca pro 65

Table of Contents