C85 non-metallic control panel:
Incoming power connection: (Power feed)
This control panel requires a 240V or 208V - 4 wire
service (L1, L2, N, & G) and must be fed with a
power circuit protected by a circuit breaker or a fused
disconnect switch to provide circuit protection and a
disconnection means.
C-85 panel requires at least a 30amp protected circuit
feeding the panel.
Connect your power feed as detailed in the wiring
diagram provided with this panel.
L1 connects to Terminal
L2 connects to Terminal
N connects to Terminal
G connects to Terminal
Be sure to provide adequate sized power conductors
to prevent excessive voltage drop. Consult with your
electrician to properly size power feed conductors.
Use copper conductors only.
Aerator power cord connection:
Your aerator (pump) will be provided with a flexible
power cord for connection to this control panel. If
the power cord has a plug, you will need to cut it off.
The power cord conductors (black, white, green) will
need to be stripped back 1/2". The outer black jacket
should be stripped back at least 3inches. Follow the
connection diagram for terminating these three wires
to the terminal blocks in the control panel.
Black connects to Terminal
White connects to Terminal #5
Green connects to Terminal
Light Kit connection:
If you purchased a Kasco light kit(s) for your aerator,
follow the light kit installation instructions for
mounting the light kit(s) to the aerator float.
This control panel requires a hardwire connection for
the light kit(s). To connect the light kit(s) you will
need to cut off the power cord plug that is molded to
the light kit power cord. Strip back the black outer
jacket of the light kit power cord at least 3inches
to reveal the three internal wires of the power cord.
(black, white, and green conductors). These three
12
#1
#2
N
GROUND - located on
hassis plate
#4
G
wires will need to be stripped back 1/2". Follow the
connection diagram for terminating these three wires
to the terminal blocks in the control panel.
Light kit connections:
Black connects to Terminal
White connects to Terminal #7
Green connects to Terminal
STEP FOUR:
Test the GFCB with the test button now and every
30 days.
If lights are installed, they can now be installed per
Instructions included with the lights.
Once completed, power can be restored to the panel.
Record the following data while the Aerator is
operating in the water under load:
Voltage:
L1-L2 ________
L1-N _________
L2-N _________
Amperage:
L1 __________
L2 __________
Date installed _____/_____/_____
Any unauthorized modifications to this control panel
will void the UL listing and the Kasco warranty.
#6
G

Advertisement

Table of Contents
loading

This manual is also suitable for:

3400hjf4400jf4400hjf

Table of Contents