2.4 Start-up test

Instruction
1
2
3
4
5
6
7
Application manual - SmarTac
3HAC024845-001 Revision: A
Action
Turn on the control cabinet power switch.
In the I/O window, turn on the output doSE_SENSOR1 and make sure doWIRE_SEL1
and doSE_REF1 are off. If these I/O assignments do not exist, see
on page
18. Verify that diSE_DET1 is on at this time. If it is not, see
on page
75.
Turn on doSE_REF1. Verify that diSE_DET1 is off at this time. If it is not, see
shooting on page
75.
Using a voltmeter, verify that there is about 38 VDC at the gas cup when referenced
to the fixture (ground). If less than 25 VDC is measured, see
page
75.
Ground the gas cup to the weld fixture using a length of wire, steel tool, or similarly
conductive object. Verify that diSE_DET1 is on at this time. If it is not, see
shooting on page
75.
Write a simple test routine using the Search_1D instruction (see
page
33).
If the Search_1D instruction is not available in the system, see
page
22.
Execute the test routine. The robot should stop when the part is detected. If not, see
Trouble shooting on page
© Copyright 2004-2016 ABB. All rights reserved.
75.
2 Installation
2.4 Start-up test
System parameters
Trouble shooting
Trouble
Trouble shooting on
Trouble
User's guide on
Loading software on
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents