Miele PWM 908 Operating And Installation Instructions page 20

Table of Contents

Advertisement

Initial commissioning
Setting up a payment system
If you wish to set up a payment system,
read the "Payment system" section of
the "Supervisor level" chapter.
These settings can only be changed
during the initial commissioning
process. If you wish to change the set-
tings after the commissioning process,
please contact Miele Technical Service.
If you do not wish to set up a payment
system, you can skip this stage.
Payment system
No payment
system
Program
KOM module
control
 Touch the
No payment system
control.
The display will change to the next set-
ting.
20
Timed
operation
 sensor
Selecting pre-wash water
Pre-wash
Cold
Hot
 Touch the
washing machine is only connected
to a cold water supply, or touch
11:02
the washing machine is connected to
cold and hot water.
The display will change to the next set-
ting.
Selecting main wash water
Main wash
OK
Cold
Hot
 Touch the
washing machine is only connected
to a cold water supply, or touch
the washing machine is connected to
cold and hot water.
Further information will appear on the
display.
cold
 sensor control if the
 sensor control if the
cold
11:02
OK
hot
 if
11:02
OK
hot
 if

Advertisement

Table of Contents
loading

Table of Contents