3. Installation
SmartHandle.
5. Replace the cover and inlay of the SmartHandle (see
Quick Start Guide or SmartHandle Manual).
The gold-coloured metal clip on the LockNode connects the
LockNode mechanically and electrically (positive pole) with
the SmartHandle. When you have mounted the cover and
inlay again, the spring-loaded metal pin contacts the inlay
(the inlay then acts as an antenna).
Information for SmartIntego users
SimonsVoss recommends the following procedure:
1.
Remove the existing LockNode.
2. Mount the new LockNode as described.
3. Open the SmartIntego Manager.
4. Select
5. Enter the new chip ID.
6. Carry out programming in the SmartIntego tool.
7. If necessary, import into the integrator system.
8. Update the documentation (installation plan).
LockNode is replaced. Do not use the old LockNode
9
anymore.
3.1. Adapter cable SO
The installation of the LockNode in the following versions of
Replace with Chip ID.
28 / 116 | EN
Need help?
Do you have a question about the WaveNet Lock-Node SH 3062 and is the answer not in the manual?
Questions and answers