Install Management Modules In Slots 1 And 2 - HP Aruba 6400 Series Installation And Getting Started Manual

Table of Contents

Advertisement

9. Power-on and verify that the installed power supply units are running properly. A steady green LED on
the front panel of a PSU indicates proper operation. (For more information on LED behavior, see the
latest version of the Monitoring Guide at https://asp.arubanetworks.com/downloads.)

Install management modules in slots 1 and 2

Skip this task if your management modules are already installed.
Aruba 6405 and 6410 : 1 and 2
Aruba 6405: 3 through 7
Aruba 6410: 3 through 12
Chapter 7 Installing components
1
NOTE: The 6400 Series chassis and PSUs do not include a power on/off switch. PSUs are
powered on by connecting the AC power cord at the rear of the chassis, and to an AC power
source.
1
3
4
5
6
7
8
9
10
11
12
2
2
Management module slots
Line module slots
71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aruba 6405Aruba 6410

Table of Contents