Power; Part Number - HP Aruba 6400 Series Installation And Getting Started Manual

Table of Contents

Advertisement

1
Figure 4: Aruba 4605 Switch grounding lug
1
Make sure the resistance between the chassis and the ground is less than 1 ohm.

Power

Perform the following tasks to meet the power requirements:
Procedure
1. Calculate the system power consumption. The system power consumption varies by module type and
density. (See System power consumption.)
2. Identify the number of power supplies. Include sufficient power to meet power consumption and
sufficient redundancy to ensure system uptime in the event of a PSU failure.
3. Verify that the power system at the installation site meets the requirements of the power supplies,
including the input method and rated input voltage. (For power supply unit (PSU) information, see
System power consumption.)
Chapter 3 Site preparation
Grounding lug
1
Aruba 4610 Switch grounding lug
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aruba 6405Aruba 6410

Table of Contents