6.3 Installation
Isolate all connecting cables (mains and battery power
O
O
supply) and lock them out (e. g. by removing all fuses
and proper securing of the mains supply distribution
board and the battery bank using warning signage and/
or locks).
Run the connecting cables (mains and battery supply)
O
O
to the control cabinet position with an adequate length
allowance (e. g. for installation in the cable trunking
inside the cabinet). This work must be carried out
properly according to the relevant standards and codes
of practice.
Secure all cable entries with the M-type glands provided.
O
O
Run all connecting cables in the cable trunking provided
O
O
in the control cabinet.
This figure shows the outgoing cables for the mains and
battery supply of slave stations mounted on C-section
rails on the cabinet wall (part no. 400 71 347 126) using
appropriate cleats. Leave no connecting cables temporari-
ly loose and unsecured!
Subsequent additions or modifications to the component
layout are possible; such work on the internal layout of
the cabinet is not described in this manual however as is
must be carried out by specially trained CEAG engineers!
The installation and connection of the general lighting
system is not described in this manual.
Lighting equipment must be assembled, run and connec-
ted according to the relevant electrical engineering stan-
dards and codes of practice. You must also comply with
all standards and directives of the country in which the
system is installed and operated.

6.4 Connection to mains

6.4.1 Connection to mains supply
of a ZB-S station
ZB-S systems are supplied from the mains and from the
batteries in a battery rank (battery cabinet or rack).
64
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
NOTE
1
2
3
Load disconnector (1) (terminal box and fuse box for the
mains supply)
Outgoing distributor (2)
Cabinet distributor (3)
N-terminal block (4)
PE-terminal block (5)
6
7
7
7
8
Connections shown with load disconnector cover
removed
Connection cables for the busbar (mains) at the back (6),
Mains supply feeders for the ZB-S station (7),
Outgoing feeders for the mains supply of US-S substations
(8)
Connecting the cables for the mains supply to the
ZB-S control cabinet:
Ensure that the system and feeders are isolated and
O
O
locked out!
Connect the earth conductors to the PE terminal block
O
O
(pos. 5).
Connect the neutral conductors to the N-terminal block
O
O
(pos. 4).
Connect the load conductors to the L-terminals (pos. 7)
O
O
on the disconnector
For single-phase operation, a load-current cable only is
connected, and the input terminals (pos. 7) on the discon-
nector are jumpered.