8.4.3 Menu 3: "Basic settings"

Overview:
Language
Date & time
Main menu
Functiontest
Test & status menu
Durationtest
Block & reset alarms
etc....
Basic settings
DLS/TLS Setup
Circuit setup
Luminaire setup
Logbooksetup
Send ServicePinMsg
Menu 3
Language
Language
Date & time
Date & time
Functiontest
Functiontest
Durationtest
Durationtest
etc....
Delay time mains
return
Manual reset
Selective EmgcyOper.
Relay setup
Buzzer setup
Display setup
Charger setup
Printer setup
Relay module setup
Webserver setup
Timer setup
Substation setup
Connection to BMS
Function keys
Optional inputs
Serialnumber & type
Password protection
Daylight saving time
Service info
 Selection of
Language
menu options
Date & time
with the
Functiontest
Durationtest
keys 
etc....
 <ok>:
confirm selec-
tion
 <Menu>: can-
cel and return
to the previous
menu (any
changes en-
tered are saved)
 <ESC>: cancel
and return to
the previous
menu (any
changes en-
tered are not
saved)
 flashing input
prompt
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
 <ok>
The currently selected
Menu 3.1: language is displayed
) Setting on delivery/initial commission-
1
ing
NOTE
Fall back language for controller re-
set or after the installation of a new
CU CG-S is allways english
Date & Time
 <ok>
We 11.01.12
Menu 3.2:
ZB-S autosync.:
Setting the system time (current date and
time) for the internal clock of the CU CG-S
control module.
ZB-S autosync:
program to „yes" only at one station of a
group All other stations are synchronised
daily via this.
Important NOTE
These settings are the basis for all
log book entries and (synchronised)
test of the system!
If the ZB-S Systems is more than
30 days out of operation, the time
should be controlled
 <ok>
F-Test Date&Time
Menu 3.3:
We 11.12.07
FT start-up time 300s 
Interval in days:
Setting the start (date and time) of the
first function test and the intervals (1 to
14 days) of subsequent function tests
(factory setting: all 7 days).
Setting the start-up time of the FT in 5s
steps (factory setting: 300s)
For all luminaires with "End of line" cut
off (EoL).
 Use the  keys to toggle between
"Language: National language"
)
1
and "Language: english"
 Finish and return to Menu 3 with
<Menu>
) Can only be selected when memory
2
card is inserted.
 Select the date and time positions
with 
12:00
 Change with 
 Finish with <Menu>
yes
This request follows:
Menu = no
 Enter "OK" synchronises the clock
of all connected substations in one
group
 Select the input position for date,
time, intervals (in days) and FT start-up
12:00
time (in 5s) with 
 Change with 
07
 Finish with <Menu>
This request follows:
Menu = no
8 Operating
)
2
Substation
synchronise ?
OK = yes
Substation
synchronise ?
OK = yes