5 Installation

5 Installation
CAUTION!
You must observe the applicable safety
requirements for setting up and operating
electrical equipment as well as the Device
Safety Law and all generally recognised
codes of practice!

5.1 Assembly

Apply bore holes as shown in Figure 1. Fasten
the device in place with suitable screws.
Tighten the screws only to finger tightness!
It is also possible to mount the device on a
35-mm DIN rail.
198
Figure 1: Fastening points

5.2 Electrical connection

Power connection
The device is designed for operation at 230 V
AC or 24 V DC. Lines must be connected as
shown in Figure 2.
8
Manual CEAG CG-Controller for CG 2000/ZB-S 30080001458 (C) July 2016 www.ceag.de
5
Floating contact
The controller provides a freely programmable
circuit contact (1 - 2 - 3, Figure 2).
Energising of the relay can be assigned to vari-
ous events. See the «Relay settings» menu
L
N PE
230 V AC
Figure 2: Power connection
Bus cables
The bus line from the connected CEAG systems
must be connected to Terminals A(2) B(2)
(Figure 3). 4 terminals are present for each
input.
Figure 3: Bus connection
1
2
3
+ –
1 2 3
24 V DC relay
Plug-in slot 2
A(2)
B(2)
CG-S-Bus (2)