6 Installation

6.1 Safety Notes

WARNING! RISK OF INJURY!
Improper mounting and installation can cause serious
personal injury and/or material damage . This work
must only be performed by authorised, skilled and
adequate personnel who have received instructions
providing information on the device and in obser-
vance of the local safety regulations .
Ensure there is enough free moving space.
O
O
Ensure orderliness and cleanliness at the working
O
O
place. Loose tools lying around are dangerous!
Assure a sufficient cooling of the system!
O
O
Observe the environmental conditions regarding the
O
O
insulation class and degree of protection (acc. to the
protection against a contact of conducting parts and
ingress of dust, impurity or moisture)
Ensure that the cable length in an emergency light
O
O
circuit to the last luminaire in the circuit does not
exceed the maximum permitted cable length.
Special regulations for ESF-E30:
O
O
Enclosures must be fitted to the masonry horizontally.
The masonry must be designed for a circuit integrity of
at least 30 minutes. The circuit integrity of the masonry
must not be impaired by assembly.
The modular layout of the items of equipment illustrated
in these assembly and operating instructions may differ
from that supplied. Particular features of custom designs
are described in the project documents that must be
ordered separately.
WARNING!
Work on the general supply network and the running
of load, signal and control cables and connection of
the battery power supply must be carried out by quali-
fied electricians with special knowledge of the legal
and technical basics for the assembly and operation of
emergency lighting systems . This takes also place for
initial commissioning or recommissioning .
Take all necessary measures to ensure occupational
health and safety!
As well as compliance with general trade standards
and procdures, this specifically includes complying
with chapters 1+2 of these instructions .
All connecting cables must be laid according to the rel-
evant electrical engineering codes of practice and stan-
dards (e. g. standard series DIN VDE 100).
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
NOTE
You must also comply with all standards and directives of
the country in which the system is installed and operated.
Secure all the cable entry and exit openings in the control
cabinet with the supplied M-type glands or rubber grom-
mets to prevent damage to the cables and ingress of
moisture.
ATTENTION!
Only ballasts and luminaires that are rated for an operat-
ing voltage of 230 V AC (50 Hz) and 220 V DC may be
connected to the outputs for the emergency lighting/final
circuits of the ZB-S system.
Many operations require the system to be isolated first
for safety reasons (or to protect components). Because
the system switches over to battery operation when the
mains supply is isolated, there are certain procedures
which must be followed - these procedures are described
below.
The controller software and its last switched status are
stored in a nonvolatile memory.
Improper use of the batteries or battery-powered parts
of the plant can cause risk of injury or danger of death
from high current or arcs that can occur briefly on bat-
tery discharge . The instructions given in this manual
for connecting/disconnecting the batteries must be
strictly adhered to (see «Connecting the Battery Power
Supply») .
Ensure that the battery banks are connected to the
correct poles (battery cabinets/racks)!
ATTENTION!
Short circuits and incorrect polarity may damage the bat-
tery bank or installation of a ZB-S or US-S system.
Provide proper ESD-protection when working on electrical
equipment (e. g. connecting control or signal cables) or
electronic equipment (e. g. fitting or removing modules in
the control cabinet)!
Never switch the mains or battery supply on or off under
load. In both of these cases the system must first be
isolated at the CU CG-S controller (or remote switch if
installed).

6.2 Assembly

Requirements to the place of assembly:
Assembly on a level surface of sufficient leadbearing
O
O
capacity.
The site must be horizontally levelled.
O
O
The baseplate of the cabinet provides holes for floor
O
O
anchoring or bolting to a base.
6 Installation
DANGER!
63