Maintenance / Checking; Safety Notes; General Information To Maintenance / Checking - Eaton CEAG ZB-S Mounting And Operating Instructions

Central battery system
Table of Contents

Advertisement

10 Maintenance / Checking

10.1 Safety Notes

WARNING! RISK OF INJURY!
Improper maintenance work can cause serious per-
sonal injury and / or material damage . This work has
to be performed only by authorised, skilled and ade-
quate personnel who have received instructions pro-
viding information on the device and in observance of
local safety regulations .
Before working on and with the system switch it off
O
O
and protect it against reset.
Do not touch the system unti its temperature is as high
O
O
as the ambient temperature.
10.2 General information to maintenance /
checking
The carrying out of the safety inspections as required
by statutes and directives has to be made regularly. The
operator of the emergency lighting system is responsible
for organising and supervising this work!
The following information must be specified in writing and
made available at all times :
The nature and extent of the work
O
O
Recording of work results
O
O
Responsibilities and permits for carrying out the work
O
O
which persons may carry out which operations?
O
O
which persons are responsible for supervising the
O
O
work?
Duties of reporting (e. g. in the case of faults or
O
O
function tests)
Organisational measures when working on the
O
O
emergency lighting system. This may include:
Duties of information and reporting on the start,
O
O
duration and end of the work
Safety measures while the work is being carried
O
O
out: e. g. standby lighting, power supply isolation
and lock-out (e. g. removing the fuses, key-operated
switch, safety signage)
Safety equipment for the personnel carrying out the
O
O
work on the plant (e. g. suitable work clothing and
personal protection equipment)
Safety equipment providing protection from hazards
O
O
caused by adjacent plant (e. g. safety grilles, barriers,
making safe or roads)
Maintenance and repair work at the emergency lighting
system can be done by the customer service of CEAG
Notlichtsysteme GmbH at any time. (s. enclosed
Customer Service Order).
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
Our customer service locations can be found all over
Germany, see the enclosed map „Addresses: CEAG
Customer Service" .
In addition, we offer you a Maintenance Contract for
Emergency Lighting making organisation easier to you!
This contract contains the annual checking and includes
the following work:
Mains/-battery shift-function of devices
O
O
Visual check of electrical equipment and batteries of
O
O
devices
Mechanical check at the devices
O
O
Checking of charging rate
O
O
Measurement of battery voltage at load
O
O
commencement and measurement of the cell voltage
Operational test of other electronics
O
O
Checking of lamps only for luminaires with
O
O
CG-monitoring
Checking of rated operation time (test of capacity) of
O
O
the batteries
Not included in maintenance services is repair and
overhaul work, in particular the replacement of defective
electronics or defective light sources.
In case of returns you need a RMA - number from us.
For further information see www.ceag.de!
10 Maintenance / Checking
NOTE
97

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents