Seagate Exos E 4U106 Hardware Installation And Maintenance Manual page 48

Table of Contents

Advertisement

Figure 32 Attaching left inner rail to the left sidewall of the physical enclosure
3. Insert the key holes present on the left inner rail into the T-pins present on the left sidewall of the enclosure, and
slide the left inner rail towards the enclosure back until it locks itself into the slots (see
Figure 33 Locking inner rail over the T-pins
4. Make sure that the screw holes (quantity 5) on the left inner rack rail are aligned to the respective screw holes
present on the left side of the physical enclosure.
5. Using the quantity-5 M3 screws provided, secure the left inner rack rail to the left side of the physical
enclosure. Torque each screw to 1.36 N-m (12 lbf-in).
Attaching the right inner rail to the physical enclosure
1. Locate inner and outer edge on rail (P/N: 727648700) as in
2. While facing the right side of the physical enclosure, align the right inner rail key holes (see
12 T-pins present on the left sidewall of the enclosure.
48
Installation
2
1
Left inner
T-pins
3
1. Aligning the left inner rail to the enclosure sidewall
2. Sliding back the inner rail through the key holes to
lock it against the T-pins (see
3. Securing the rails using M3 screws
Figure
31.
2
1
Figure
33)
Figure
33).
Figure
31) to the

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents