Fayat BOMAG BT 60/4 Operating And Maintenance Instructions Manual page 50

Table of Contents

Advertisement

Fig. 59
To read the maximum speed set the throttle le-
l
ver to position MAX (Fig. 59).
After approx. 30 to 40 seconds read the idle
l
speed from the existing engine rpm-meter
(Fig. 58).
Adjusting the engine speed
Shut down the engine.
l
Fig. 60
Remove the protection grid on the left hand
l
side of the engine ((Fig. 60)).
BT 60/4, BT 65/4
Fig. 61
Adjust the idle speed using the rear stop screw
l
(2) on the engine speed control lever (1) (Fig.
61).
Adjust the maximum speed by the front stop
l
screw (3).
Secure the stop screws (2, 3).
l
Assemble the protection grid on the left hand
l
side of the engine.
i
Note
Adjust the throttle cable, if this should be neces-
sary.
540249
BOMAG
Maintenance every year
1
3
2
540083
51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bomag bt 65/4

Table of Contents