Sungrow SG33CX User Manual page 36

Pv grid-connected inverter
Hide thumbs Also See for SG33CX:
Table of Contents

Advertisement

4 Mechanical Mounting
Tab. 4-2 Fastening sequence
Item
Designation
A
Wall
B
Expansion bolt
C
Mounting-bracket
Take out the inverter from the packing case.
Step 5
Hoist the inverter to the installation position when necessary (refer to
Step 6
4.4.2 Hoisting Transport). If the installation position is not high enough,
skip performing this step.
Hang the inverter to the mounting-bracket and ensure that the mounting
Step 7
ears perfectly engage with the mounting-bracket.
Fix the inverter with screws.
Step 8
26
Description
-
Fastening the bolt in the sequence of nut, spring
washer, slat washer
-
User Manual
A
16mm
35N.m
B
C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg40cxSg50cx

Table of Contents