Indicator Light, Green (7); Indicator Light, Red (8); Control Unit's Instructions To Engineer; Installation Of The Control Unit C260Vkk - Harvia C260 Manual

Hide thumbs Also See for C260:
Table of Contents

Advertisement

EN

2.7. Indicator Light, Green (7)

When indicator light 7 is on, the screen displays the
time set for the heater to be on.

2.8. Indicator Light, Red (8)

When indicator light 8 is on, the heater is turned on.
Please note! Make sure that the heater's control unit
is disconnected from the heater's resistors when the
timer's program timings are completed.
3. CONTROL UNIT'S INSTRUCTIONS
TO ENGINEER
In accordance with the regulations in force,
connecting the control and power units and the
thermostat to the mains may only be carried out by
a suitably authorised, professional electrician.
The person responsible for installing the control unit
must deliver, along with the heater device, the
following instructions for installation and use and give
the person who will be in charge of the heater and the
control unit the necessary training before leaving the
installed device in his/her care!
3.1. Installation of the Control Unit
C260VKK
The control unit should be mounted outside the sauna
room, in a dry area.
Please note! The control unit may not be the
embedded in the wall structure. (Fig. 24)

3.1.1. Removing the Top Plate

The top plate should be removed before you mount the
control unit on the wall. The top plate comes off by
pressing down on the locking strip at the upper edge of
the plate, using a screwdriver, for example. The hole
blanks for the connecting wires in the base plate should
be pierced in the places where the cables are to be
connected. (Fig. 25)
Figure 24.
Wall-mounting the control unit
Figure 25.
Location of hole blanks in the base
plate of the control unit
CZ
2.7. Kontrolka zelena (7)
Kdyz sviti zelena kontrolka (7) na na displeji,
nacasovani pro kamna je zaple.
2.8. Kontrolka cerwena (8)
Kdyz svizi kontrolka 8, kamna byly sepnuty.
POZOR!
Pÿi nastavovani ÿasovaÿe mÿjte hlavní vypínaÿ
vypnutý a až po celkovém nastavení mÿžete
Hlavní vypínaÿ sepnout.
3. Instrukce pro montaz jednotky
pro poverenou osobu.
V souladu s platnými predpisy,
pripojeni ovladacich a silovych jednotek.
Zapojeni veskere elektroinstalace
muze provadet pouze elektrikar s
odpovydajicimi vzdelanim a povolenim.
Osoba, která bude jednotku zapojovat
je povinna proškolit odpovednou osobu
ktera se bude o spinani sauny starat.
3.1.
Instalace ovladaci jednotky
Ovladaci jednotka musi byt umistena
zvenku sauny v suchých prostorách.
POZOR!!!
Jednotka nesmí byt zapustena pod uroven
steny. ( Obr. 24 )
3.1.1. Demontaz predniho krytu
Predni kryt s musi oddelat
drive nez budeme jednotku montovat na
zed. Predni kryt sundate tak ze plastove
packy zatlacite dovnitr a predni kryt
oddelate.
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents