3.13 Verifying the Installation

Verifying the Chassis Installation
Verify the chassis installation against the check items in
not meet the requirements.
Table 3-2 Verifying the chassis installation
No.
1
2
3
4
5
Verifying the Cable Installation
Verify the cable installation against the check items in
not meet the requirements.
Table 3-3 Verifying the cable installation
No.
1
2
3
4
5
6
7
8
Issue 25 (2019-11-30)
Check Item
Labels on the chassis are clear and properly pasted.
Screws for securing the chassis are properly installed.
Paint on the chassis is not scraped and the surface is not
stained. Otherwise, apply paint or clean up the stains.
Filler panels are installed in all vacant slots.
The instruction manual and accessories delivered with the
product are intact.
Check Item
Cables are properly routed in the cabinet, complying with
Huawei's cable layout specification.
Power cables and PGND cables are properly connected.
PGND cables and power cables are intact without joints.
Power cables and PGND cables are straight and not
coiled.
Power cables, PGND cables, and signal cables are bound
separately, and the distance between a power cable and a
signal cable and the distance between a PGND cable and a
signal cable meet requirements.
Cables are not installed above the heat dissipation holes.
Cable ties are evenly spaced and properly fastened.
The bending radius of a cable meets the specifications.
Copyright © Huawei Technologies Co., Ltd.
3 Installing the E9000
Table
3-2. Rectify any item that does
Check Result
-
-
-
-
-
Table
3-3. Rectify any item that does
Check Result
-
-
-
-
-
-
-
-