Unpacking The Chassis Packing Case - Huawei E9000 User Manual

Hide thumbs Also See for E9000:
Table of Contents

Advertisement

E9000 Server
User Guide
l
Auxiliary Materials
l
l
l
l
l
Components
l
l
l
l
l
l
l

3.2 Unpacking the Chassis Packing Case

Procedure
Step 1 Check the packaging and the seal on the packing case.
Step 2 Use a pallet truck to carry the chassis to the equipment room, and remove the pallet truck.
Figure 3-2 Carrying a chassis
Issue 25 (2019-11-30)
Floating nut hook
Screws (M6)
Cable ties
Fiber binding tapes
Corrugated pipes
Floating nuts
Compute nodes
Switch modules
PGND cables
Ethernet signal cables
Power cables
Optical modules
Optical cables
If the packing case is damaged (for example, the packing case is wet or deformed, or the seal or
pressure-sensitive tape is unsealed), preserve onsite evidence and report the actual conditions to the
supplier or Huawei Technologies Co., Ltd.
Copyright © Huawei Technologies Co., Ltd.
3 Installing the E9000
46

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents