Miele FNS 28463 E ed Operating And Installation Instructions page 88

Hide thumbs Also See for FNS 28463 E ed:
Table of Contents

Advertisement

Installation
The holes for securing the
connecting bracket  have to be
pre-drilled.
 Push the connecting bracket  with
cut-outs  over the holders for the
wall spacers.
 Use a pen to mark the position of the
drill holes.
 Then take the connecting bracket 
off again.
Drill through the panel only. Drilling
depth approx. 1 mm.
 Drill the screw holes with a 3 mm drill
bit and then file any rough edges
smooth.
88
 Place the connecting bracket  so
that the horizontal long slot is on the
left hand side and secure it as
follows:
1. Secure it loosely with the screw .
2. Adjust the connecting bracket  until
its centre piece abuts against the
side of the second appliance.
3. Secure the connecting bracket 
using the screw .
4. Now tighten the loose screw and as
you do so push the right hand
appliance up against the left hand
appliance.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fns 28463 e cs

Table of Contents