Section 2: Operator Installation - Genie GCL-MT Manual

Medium duty operator trolley operator
Hide thumbs Also See for GCL-MT:
Table of Contents

Advertisement

Section 2: Operator Installation

The Drawbar Operator consists of the:
A. Power Unit
B. Drawbar Track
C. Chain Guides
D. Drawbar Arm
E. Front Spreader
F. Front Idler Pulley
G. Drive Chain
H. Drive Sprocket
I. Drawbar Track Spacer
The Drawbar track length, chain length and quantity of chain guides will vary by door heights. Fig. 1.
1. The Drawbar Track Spacers are attached to the Power Unit at the factory. Fig. 1.
• Attach Track to Power Unit at the Spacers using eight (8) 1/4"-20 x 1-1/2" track bolts and 1/4"-20 keps
nuts (provided). Fig. 2.
• The curved part of the Track MUST be toward the electrical panel.
NOTE: Drawbar tracks must be thirty (30) inches longer than the door's height. Tracks are pre-punched at the
door plant for the chain guide assemblies
Sec-2.1
B
F
G
Fig. 2
C
I
E
I
H
D
A
Fig. 1

Advertisement

Table of Contents
loading

Table of Contents