Genie GCL-MT Manual page 23

Medium duty operator trolley operator
Hide thumbs Also See for GCL-MT:
Table of Contents

Advertisement

1) For a single 3 - button installation, make connections as shown in Fig. 1.
2) For single button accessory controls, make connections as shown in Fig. 2.
3) For a multiple 3 - button installations, make connections as shown in Fig. 3.
4) Install WARNING placard next to control station. Fig. 4
CONTROL SIGNAL TERMINAL STRIP
OPEN CLOSE STOP
NOTE
JUMPER BETWEEN
STOP AND GND
TERMINALS MUST
BE REMOVED
CONTROL SIGNAL TERMINAL STRIP
OPEN CLOSE STOP
OPEN
CLOSE
STOP
3-BTN
STATION
NOTE: If an External STOP button is NOT being installed, a jumper wire must be installed between the "STOP" and
"GND" terminals as shown in Fig. 2.
NOTE: Low voltage wiring can be run a maximum of 1000 feet. DO NOT use long distance wiring kits on this
operator.
Section 3: Wiring
3-BTN
GND
Station
OPEN
CLOSE
STOP
Fig. 1
GND
NOTE: JUMPER
BETWEEN STOP
AND GND TERMINALS
MUST BE REMOVED
OPEN
CLOSE
STOP
3-BTN
STATION
Fig. 3
CONTROL SIGNAL TERMINAL STRIP
STOP
GND
1-BTN
1-BTN
Station
Key
Switch
Station
Card
Reader
Open/Close
Pull Switch
Fig. 2
Entrapment Warning
Placard
Fig. 4
ODC
STB
Sec-3.6

Advertisement

Table of Contents
loading

Table of Contents