Siemens AVS75.39 Series User Manual page 153

Boiler controller
Table of Contents

Advertisement

Boiler
Electrical connections
Electrical connections
Siemens
Building Technologies
Line no.
Operating line
5770
Source type
1-stage ¦ 2-stage ¦ Modulating 3-position ¦ Modulating UX ¦ Without boiler
sensor
1-stage
In the case of a 1-stage boiler plant, the burner stage of the 1-stage boiler is
released as soon as a boiler temperature setpoint is active.
°C
40°C
1
BR
0
Use
L1
Phase burner
Protective earth
N
Neutral conductor
T1
Phase burner 1st stage
T2
Burner 1st stage ON
S3
Input burner fault
EX1
Input burner 1st stage hours run.
2-stage
If the required boiler temperature setpoint cannot be attained with the first burner
stage, the second burner stage will be released (release integral satisfied).
When the second burner stage is released, the first burner stage stays active, but
setpoint control will be ensured by the second stage.
The first stage can be switched off again only when the second stage is locked
(reset integral satisfied).
Use
L1
Phase burner
Protective earth
N
Neutral conductor
T1
Phase Burner 1st stage
T2
Burner 1st stage ON
S3
Input burner fault
EX1
Input burner 1st stage hours run
FX1
Phase Burner 2nd stage
(T6)
QX1
Burner 2nd stage on
(T8)
User manual RVS43.345
The settings in detail
TKx
Socket
Connector type
B
AGP8S.07A/109
Socket
Connector type
B
AGP8S.07A/109
Z
AGP8S.04C/109
TKw+SDK½
TKw
TKw-SDK
½
t
153 / 239
CE1U2354en_021
2013-09-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents