Toshiba nv Series Instruction Manual page 63

Type2 soe function unified controller
Hide thumbs Also See for nv Series:
Table of Contents

Advertisement

Chapter 4
Startup/Shutdown and
Operation
This chapter describes startup and the shutdown method of a SOE
functional system and the operations of the SOE Information Screen.
4.1
Checking the Switch before Startup ··························· 42
4.2
Startup of the System ················································ 42
4.3
Shutdown of the System ············································ 43
4.4
Start SOE Information ················································ 44
4.4.1
4.4.2
4.5
Show SOE Information ··············································· 46
4.6
Switch Node ······························································ 48
4.7
Update event run mode ·············································· 49
4.8
SOE Restart ······························································· 49
4.9
Save CSV file ····························································· 50
4.10 Close SOE Information ·············································· 52
Start from Guidance ············································· 44
Start from TOSDIC-CIE DS OIS-DS Program ············· 45
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sa9a1

Table of Contents