Operation With Loading - Martin QC 1 Installation Manual

Heavy-duty pre cleaner
Hide thumbs Also See for QC 1:
Table of Contents

Advertisement

4.3
© Martin Engineering GmbH

Operation with loading

NOTE
Read through this chapter thoroughly before starting any work on
the belt cleaner or the customer's conveyor system.
CAUTION! FLYING PARTS!
Tools or installation parts which are left behind can fall from a
moving conveyor belt and may cause minor injuries and damage
to property.
After installation, first remove the tools from the place of installa-
tion and from the conveyor belt before switching on the power sup-
ply.
WARNING! DANGER OF INJURY!
Body parts and/or clothing may get caught and pulled in by rotat-
ing parts or by the moving conveyor belt.
Before any installation or maintenance work is carried out, ensure
that all power sources to the conveyor belt system and its acces-
sories are switched off and secured against inadvertent reactiva-
tion.
Use warning signs!
1. Remove all tools and fire protection covers from the installation
area and conveyor belt.
2. Operate the conveyor system with a load for one hour.
CAUTION! DANGER OF DAMAGE!
Never operate the belt cleaner for more than 15 minutes on the
running and unloaded conveyor belt when it is fully tensioned.
There is the risk of the belt cleaner getting damaged and/or the
conveyor belt getting damaged by overheating.
Operate the belt cleaner with full tension against the conveyor belt
only when it is running and fully loaded.
3. After operation with a load for one hour, shut down the convey-
or system, switch off the power supply and secure it against be-
ing switched on inadvertently.
4. Make sure that all securing parts are tightened. Tighten loose
connections.
21
M3618UK-11/14

Advertisement

Table of Contents
loading

Table of Contents