Installation procedure

Determining the installation position

Determining the position of the mainframe and the tensioner of the
MARTIN
®
QC
#1 heavy-duty primary cleaner must be done on
both sides of the chute wall. In doing so, the positions are deter-
mined where the mainframe of the MARTIN
primary cleaner passes through the chute wall or where the tension-
er is installed on the chute wall.
The MARTIN
®
QC
#1 heavy-duty pre-cleaner is operated along
with a spring tensioner. This is de-installed at the factory before de-
livery and is reinstalled during the installation along with the primary
cleaner.
The installation of the MARTIN
and the tensioner is described in this manual and in the installation
manual of the tensioner.
There follows an overview of the installation steps:
No.
Installation step
1
Positioning the mainframe of the
primary cleaner
2
Installing the primary cleaner
3
Installing the tensioner
4
Installing the primary cleaner
Tab. 1: Installation steps
It is possible to have different local conditions at the time of installa-
tion; these require different working steps, which are illustrated be-
low:
Installation on an encapsulated delivery system
• Carry out the instructions according to chapter 5.2.2
onwards.
Installation on an encapsulated delivery system with existing instal-
lation openings and brackets for belt cleaners.
• Carry out the instructions given in chapter 5.2.3 onwards.
Installation on an open delivery system
• Use the local resources to ensure that the dimensions for
the installation are correctly maintained.
®
QC
#1 heavy-duty primary cleaner
14
®
QC
#1 heavy-duty
Instruction
M3618
M3618
M3296 or M3263
M3618
M3618UK-11/14