• Remove the service cover of the outdoor unit, and connect the end of the connection cord with screws to the terminal block. ( Refer to wiring diagram inside
the top cover and caution label on the service cover)
• When connections are completed, fasten the connection cord with the cable clamp and reinstall the service cover. ( Figure. 21 )
For Cooling Only Model
Terminal block
Ground screw
Cable clamp
NOTE
• The air conditioner always requires grouding.
• Be sure to comply with local codes on running the wire from the indoor unit to the outdoor unit.
• Every wire must be connected firmly.
• During installation, proceed first with refrigerant connections between indoor and outdoor units, and only then
make the electrical ones;similarly, when disassembling, disconnect the electrical wiring first and only then open refrigerant connections.
• Unit must be installed according to applicable national installation standards.
14 seer single and three phase single packaged air conditioner and gas furnace system with r-410a refrigerant 2-5 nominal tons (sizes 24-60) (10 pages)
15.2+ seer2 2-stage packaged air conditioner and gas furnace system with r-410a refrigerant single and three phase 2-5 nominal tons sizes 24-60 (61 pages)