3 Replacement of Main Parts
Following table describes the necessary adjustment after the replacement of each parts.
Replacement Parts
MAIN BOARD
POWER BOARD
TOOL CARRIAGE
CARRIAGE WIRE
3-1 PEN CARRIAGE ASSEMBLY_REMOVING
Remove the GUIDE RAIL COVER and CARRIAGE
1
COVER.
Remove the screw shown in the figure together with the
2
washer.
Remove the CARRIAGE BOARD and disconnect the
3
PINCH ROLL SENSOR WIRE, SOLENOID WIRE and
CARRIAGE CABLE.
Necessary Adjustment
1. Initialize
2. Select Model Type by DIP SW on Main Board.
3. Upgrade Firmware.
4. Tool Pressure Adjustment
5. Calibration
6. Auto Cutter Adjustment
1. Motor Balance Adjustment
1. Tooll Height Adjustment
2. Tool Pressure Adjustment
1. Wire Tension Adjustment
CARRIAGE COVER
PINCH ROLL
SENSOR WIRE
SOLENOID
WIRE
3 Replacement of Main Parts
3
WASHER
CARRIAGE CABLE
CARRIAGE
BOARD
17