James Rebarscope R-C-400 Operator's Manual page 62

Table of Contents

Advertisement

Using the 3D graph option:
a. Press the 3D command symbol.
b.
Set the Slice number to 1
c. Browse for the first Scan Map, select it and click
open, at this stage nothing will appear on the
graph space.
d. Set the Slice number to 2.
e. Browse for the second Scan Map (usually all Scan
Maps are save in the same location), select it and
click open.
f.
The graph starts to form, and by adding more slices
the graph will expand in the Z-direction.
g. To export the graph, click "Export".
h. Choose s suitable format and click Save.
www.ndtJames.com
Fig. 61: Graph Window
Fig. 62: Graph Window with Export Dialog Screen
57

Advertisement

Table of Contents
loading

Related Products for James Rebarscope R-C-400

This manual is also suitable for:

Rebarscope r-c-450Rebarscope r-c-410

Table of Contents