Connection Of The Unit To Electric Network; Start-Up Recommendations; System Protection; Pre-Startup Recomendations Of The Unit (In The Presence Of The Enduser) - Salda AMBERAIR COMPACT RH Series Mounting And Installation Instruction

Table of Contents

Advertisement

• In order to reduce air loss in the system, the air ducts and profile parts should be of class C and higher. Their catalog can be found in our
website.
• If air handling unit is installed in heated premises, outdoor and exhaust air ducts must be insulated in order to avoid heat loses and condensing.
If AHU is installed outdoors, it's recommended to insulate all the air ducts.
• It is recommended to maintain a distance of up to 8 meters between air intake and air exhaust ducts. Air supplying system should be installed
further from potential air pollution sources.
• Use holders while installing air ducts next to the ventilation equipment. They suppress vibration and ensure a firm installation of various system
parts.
• Necessary holders can be found in our catalog or website.
• A common mistake is that air ducts are attached to improper airflow connection. On the ventilation equipment there are signs, indicating the air
duct to be connected. Before starting the system carefully check whether the work was performed properly.

5.7. CONNECTION OF THE UNIT TO ELECTRIC NETWORK

• Supply voltage to the unit must be connected by a qualified specialist following the manufacturer's instructions and effective safety instructions.
• The unit's power network voltage must correspond to electrotechnical parameters of the unit indicated in the technical lable or in the technical
manual.
• The unit's voltage, power and other technical parameters are provided in the unit's technical lable or in the technical manual. The unit must be
connected to the power network in compliance with the effective requirements and following the manufacturer's instructions.
• The unit must be earthed according to the rules on installing electrical equipment.
• It is prohibited to use extension wires (cables) and power network plug socket distribution devices.
• Prior to carrying out any ventilation unit installation and connection activities (until its hand-over to the customer), the unit must be disconnected
from the power network.
• After installation of the ventilation unit, disconnection from the power network is performed through the external protection device and unit
main switch.
• The unit must be thoroughly checked against damages (execution, control, measurement nodes) during transportation before it is connected
to the power network.
• The power cable can be replaced only by a qualified specialist upon the evaluation of the rated power and current.
The manufacturer does not assume any liability for personal injuries and property damage due to noncompliance with the
provided instructions.

5.8. START-UP RECOMMENDATIONS

5.8.1. SYSTEM PROTECTION

The control automatics of the unit have integrated protection against a short circuit of those assemblies. The controllers have the following pro-
tectors:
MCB
F1, F2 - 1A(5x20) MCB protection;
EX2
to change depending on the product
To ensure safe maintenance of the unit, it is necessary to turn off main switch and/or external protection device.

5.8.2. PRE-STARTUP RECOMENDATIONS OF THE UNIT (IN THE PRESENCE OF THE ENDUSER)

Prior to start-up the system must be thoroughly cleaned. Check whether:
• operation systems and unit elements as well as automation and automation devices were not damaged during installation,
• all electrical devices are connected to power supply and fit for service,
• all necessary automation elements are installed and connected to power supply and MCB, EX1, EX2 terminal blocks,
• cable connection to MCB, EX1, EX2 terminal blocks comply with the existing power connection diagrams,
• all electrical equipment protection elements are properly connected (if they are additionally used),
• cables and wires correspond to all applicable safety and functional requirements, diameters, etc.,
• earthing and protection systems are properly installed,
• condition of all seals and sealing surfaces is correct.

6. MAINTENANCE

6.1. SAFETY INSTRUCTION

It's necessary to stop the unit before opening it's doors. Disconnect the main switch and open doors after fans stop com-
pletely (approximately 2 min.). It necessary to assure, that the main switch cannot be turned on by the third parties.

6.2. COVER OPENING

1. Doors opening with handles (2-4 pic.)
2. Doors opening with clamp (5-11 pic.)
3. Remove coil tubes cover (5-11 pic.)
AMBERAIR COMPACT RH v2019.08
EN |
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Amberair compact 7 rh eAmberair compact 7 rh wAmberair compact 7 rh c

Table of Contents