Advertisement

AKU/AKU EKO
EN
MOUNTING AND INSTALLATION INSTRUCTION

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AKU Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Salda AKU Series

  • Page 1 AKU/AKU EKO MOUNTING AND INSTALLATION INSTRUCTION...
  • Page 2: General Information

    SYMBOLS AND MARKING SKU000000 Product name Nominal voltage frequency 000 0 VAC Max.current 00.00 A Max.power consumption 0.00 kW Protection class IP 00 LN: LN000000 2019.01.01 Made in Šiauliai, Lithuania Figure 1.1 - Technical label 1 - Logo; 2 - Product code (SKU); 3 - Product name; 4 - Technical data; 5 - Production place; 6 - Lot number and production date. Figure 1.2 - Indication for air flow direction.
  • Page 3: Safety Measures

    SAFETY MEASURES Do not use this unit for purposes other than those provided in its design. Do not dismantle and modify the unit. Such actions can cause mechanical fault or even injury. Use special working clothes when installing and maintaining the unit. Be careful – angles and edges of the unit and its components can be sharp and cause injuries.
  • Page 4: Electric Installation

    ELECTRIC INSTALLATION Units contain rotating parts and are connected to the mains. It may cause risk to people health and life. Therefore, it is obligatory to follow safety requirements when performing installation works. In case of any doubts regarding safe installation and operation of the unit, please contact the manufacturer or his representative.
  • Page 5: Wiring Diagram

    WIRING DIAGRAM yellow – green blue brown black yellow white TB (#4)/ Z(#5) yellow – green blue brown black yellow – green brown blue black orange white START-UP Operation start-up of the unit shall be performed only by trained and qualified personnel. Before start-up, make sure that power supply circuit corresponds to the specification indicated in the label.
  • Page 6: Dimensions And Weight

    If there is no air filter in front of the fan, the only fan maintenance required is cleaning of the impeller. It is recommended to clean the impeller at least once every six months. Before cleaning it is necessary to turn-off power supply voltage and to block the switch in order to avoid accidental switching-on during mainte- nance.
  • Page 7: Technical Data

    TECHNICAL DATA AKU EKO - phase/voltage [50 Hz/VAC] ~1, 230 ~1, 230 ~1, 230 ~1, 230 ~1, 230 - power [kW] 0,055 0,114 0,195 0,213 0,448 - current 0,46 0,99 1,45 1,69 - speed [min 4480 3490 3380 3220 3580 - max.
  • Page 8 1280 1280 1280 ErP Compliance 2018 2018 2018 2018 2018 2018 Internet address for disassembly instructions www.salda.lt AKU EKO Declared typology Unidirectional Unidirectional Unidirectional Unidirectional Unidirectional Type of drive Variable Variable Variable Variable Variable Type of HRS Nominal NRVU flow rate...
  • Page 9: Declaration Of Confomity

    Should any alterations be made in the products, this declaration will no longer apply. Notified body: VšĮ Technikos priežiūros tarnyba, Naugarduko g. 41, LT – 03227 Vilnius, Lithuania, identification number 1399. Quality: Salda UAB activities are in line with the international quality management system standard ISO 9001:2015. Date...
  • Page 10: Warranty

    3.4. when the unit was used not for its original purpose. 3.5. Company SALDA UAB is not responsible for potential loss of property or personal injury in cases where AHU is manufactured without a con- trol system and the control system will be installed by the client or third parties. The manufacturer’s warranty does not cover devices that will be damaged by installing the control system.
  • Page 11 AKU_AKU EKO v2019.04...
  • Page 12 Every 3-4 Filter replacement months** * - Look at the product label. ** - At least. NOTE. The purchaser is required to fill in the “Product maintenance table”. MAN000149 MAN000149 Ragainės g. 100 +370 41 540 415 Šiauliai LT-78109, LITHUANIA office@salda.lt...

Table of Contents