Commissioning; Checking Before Power-On; Powering On The Sun2000 - Huawei SUN2000-63KTL-JPH0 User Manual

Hide thumbs Also See for SUN2000-63KTL-JPH0:
Table of Contents

Advertisement

SUN2000-63KTL-JPH0
User Manual

6.1 Checking Before Power-On

No.
1
2
3
4
5
6
7
8

6.2 Powering On the SUN2000

Precautions
Before turning on the AC switch between the SUN2000 and the power grid, use a multimeter
set to the AC position to check that the AC voltage is within the specified range.
Procedure
Step 1 Turn on the AC switch between the SUN2000 and the power grid.
Issue 04 (2019-06-30)
Acceptance Criteria
The SUN2000 is installed correctly and securely.
DC switches and the downstream AC switch are OFF.
All cables are connected correctly and securely.
Used cable glands are sealed and locking caps are tightened.
Unused terminals and ports are locked by watertight caps.
The installation space is proper, and the installation environment is clean
and tidy, without foreign matter.
The AC terminal cover is reinstalled.
The maintenance compartment door is closed and the door screws are
tightened.