Commissioning and configuration

12
Commissioning and configuration
12.1

Measures to be performed prior to the initial commissioning

 Before commissioning, familiarize yourself with the operation and configuration of the
MA 235i.
 Before connecting the supply voltage, recheck all connections and ensure that they
have been properly made.
The Leuze device must be connected to the internal RS 232 device interface.
Connecting the Leuze device
 Open the housing of the MA
14.7) through the middle threaded opening.
 Connect the cable to the internal device interface (X30, X31 or X32, see chapter 7.5.1).
 Use rotary switch S4 (see chapter 8.2.5) to select the connected device.
 Now screw the PG cable gland into the threaded opening to provide strain relief and
ensure protection class IP 65.
Set CANopen device address
By setting the CANopen address, the MA
Each network device is thereby automatically informed that it is a slave on the CANopen
with its specific address and that it is initialized and queried by the PLC.
The CANopen permits an address range from 0 to 127, the MA a range from 0 to 99. Other
addresses must not be used for data communication.
 Set the station address of the gateway using the two rotary switches S1 and S2 (ones
and tens places).
Figure 12.1: Rotary switch for setting the address
58
235i
and lead the corresponding device cable (see chapter
235i
is assigned its respective station number.
Tens
Ones
MA
235i
Leuze electronic