Pre-Operation Inspection; Operation Inspection - HOKUYO AUTOMATIC UST-05LN User Manual

Scanning laser range finder
Table of Contents

Advertisement

8.1 Pre-operation inspection

After configuration is completed, pre-operation inspection test should be performed using a test piece.
User should perform this inspection without connecting the sensor to the system. Table 8-1 shows an
example of pre-operation inspection items list.
No.
UST is correctly mounted at the intended location and
1
screws are firmly fastened
2
All the wirings are correctly connected
When the test piece is placed in the detection area
3
Output 1 to 3 switch from ON state to OFF state
When the test piece is removed from the detection area
4
Output 1 to 3 switch from OFF state to ON state
5
Area switching is according to input signal
* Must check items 3 and 4 for all the areas.

8.2 Operation inspection

This test should be performed when pre-operation inspection is completed. This operation inspection
must be performed with sufficient safety measures been taken. If this inspection test is done before
pre-operation test, the system can get damaged. Table 8-2 is an example of operation inspection list.
No.
When the test piece is placed in the detection area
1
Output 1 to 3 switch from ON state to OFF state
When the test piece is removed from the detection area
2
Output 1 to 3 switch from OFF state to ON state
3
Area switching is according to input signal
4
Predetermined system operation is carried out as expected
* Must check items 1 and 2 for all the areas.
42
Table 8-1 Pre-operation inspection list
Check item
Table 8-2 Operation inspection list
Check item
Document No: C-41-02490-9
Condition
Remark
Yes
No
Condition
Remark
Yes
No