ILX Lightwave LDC-3926339 User Manual page 82

6a current source module
Table of Contents

Advertisement

*TST?
Test?
Action
Response
Example
*WAI
Wait to Continue
Action
Note
Example
02_03
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Performs internal self-test, then reports results.
0 = test completed with no errors.
Non-zero = test not completed, or was completed with errors.
TST?
Prevents the instrument from executing any further commands until OPC (operation complete)
status is true.
This command can be used to make the instrument wait until an operation is complete before
continuing.
Care should be taken to set the GPIB time-out appropriately for use with the *WAI command. After
this command (or the Delay) command is sent, the controller may receive up to 20 more commands
before the wait period is over. If more than 20 commands are sent before the delay or wait period is
over, the additional commands will be ignored and an error E220 will be generated.
*WAI-Wait until OPC status is true.
C O M M A N D R E F E R E N C E
GPIB Command Reference
4
C H A P T E R
65
LDC-3926339

Advertisement

Table of Contents
loading

Table of Contents