HPE Adaptive Rack Cooling System configured at one end of two IT racks
NOTE: For this special installation, join hose barbs together and install them only on the farthest rack
from the HPE Adaptive Rack Cooling System (left rack in this illustration). Purchase an extra Y-
connection for this installation.
2. Install the pressure pickup tubes on the top of the extension in the IT racks identified in step 1.
Installation
31