Carrier Aquaforce 30XA302 Installation, Operation And Maintenance Instructions page 38

Air-cooled screw chillers
Hide thumbs Also See for Aquaforce 30XA302:
Table of Contents

Advertisement

9.2.2 - 30XA 402-452 - heat reclaim option
9.2.3 - 30XA 502 - heat reclaim option
ATTENTION: The condenser connection sleeves are not
installed, but supplied with the unit. The sealing joints are
in the control box. The temperature sensors and the
condenser flow switch are wired and fixed in the machine.
They must be installed as described in the chapter
"Condenser water connections".
38
Legend
All dimensions are given in mm.
Required clearances for maintenance (see note)
Recommended space for evaporator tube removal
Water inlet for standard unit
For options 5, 6, 100A, 100C, 107 refer to the
certified drawing.
Water outlet for standard unit
For options 5, 6, 100A, 100C, 107 refer to the
certified drawing.
Air outlet – do not obstruct
Power supply and control connection
C
Control circuit connection for option 158
A
Heat reclaim condenser
NOTES:
-
Drawings are not contractually binding.
-
Before designing an installation, consult the certified
dimensional drawings, available on request.
-
For the positioning of the fixing points, weight
distribution and centre of gravity coordinates please
refer to the dimensional drawings.
-
If the installation includes several units or if this
(these) is (are) close to walls, please refer to chapters
3.11 - "Multiple chiller installation" and 3.12 -
"Distance to the wall" of this document to determine
the space required.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents