Carrier AquaForce 30XQ0502 Installation, Operation & Maintenance Instructions Manual
Carrier AquaForce 30XQ0502 Installation, Operation & Maintenance Instructions Manual

Carrier AquaForce 30XQ0502 Installation, Operation & Maintenance Instructions Manual

Air cooled heat pump chillers
Table of Contents

Advertisement

Installation, operation, maintenance
30XQ0330 to 1502
instructions
30XQ0330~1502 AIR COOLED HEAT PUMP CHILLERS
Refrigerant: HFC-134a

Advertisement

Table of Contents
loading

Summary of Contents for Carrier AquaForce 30XQ0502

  • Page 1 Installation, operation, maintenance 30XQ0330 to 1502 instructions 30XQ0330~1502 AIR COOLED HEAT PUMP CHILLERS Refrigerant: HFC-134a...
  • Page 2: Table Of Contents

    6.2 – Heating operating range ..........................28 6.3 - Minimum chilled water flow (units without hydraulic module) ..............29 6.4 - Maximum chilled water flow (units without hydraulic module) ..............29 6.5 - Variable flow evaporator ..........................29 Carrier Yileng - Shanghai, China...
  • Page 3 10.7 - Evaporator maintenance ..........................44 10.8 - Compressor maintenance ..........................44 10.9 - Precaution for compressor power supply bus bar connection ............... 45 11 – START-UP CHECK LIST FOR 30XQ HEAT PUMP CHILLERS (USE FOR JOB FILE) ......46 Carrier Yileng - Shanghai, China...
  • Page 4: Introduction

    If damage is detected upon receipt, immediately file a claim with the shipping company. Carrier strongly recommends employing a specialized company to unload the machine. Do not remove the skid or the packaging until the unit is in its final position. These units can be moved with a fork lift truck, as long as the forks are positioned in the right place and direction on the unit.
  • Page 5: Maintenance Safety Considerations

    Only charge liquid refrigerant R-134a at the liquid line. Ensure that you are using the correct refrigerant type before recharging the unit. Charging any refrigerant other than the original charge type (R-134a) will impair machine operation and can even lead to Carrier Yileng - Shanghai, China...
  • Page 6 Periodically inspect all valves, fittings and pipes of the refrigerant and hydronic circuits to ensure that they do not show any corrosion or any signs of leaks. It is recommended to wear ear defenders, when working near the unit and the unit is in operation. Carrier Yileng - Shanghai, China...
  • Page 7: Preliminary Checks

    Typical applications of these units are in refrigeration systems, and they do not require earthquake resistance. Earthquake resistance has not been verified. If the unit is ordered with the vibration damper kit, please observe the safety and installation notices in the kit installation instructions. Carrier Yileng - Shanghai, China...
  • Page 8 • Check the protection of moving parts. • Verify the accessibility for maintenance or repair and to check the piping. • Verify the status of the valves. • Verify the quality of the thermal insulation and of the vapour barriers. Carrier Yileng - Shanghai, China...
  • Page 9: Dimensions, Clearances

    Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
  • Page 10: 30Xq0430/502

    Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. 3.3 - 30XQ625/670/702 Carrier Yileng - Shanghai, China...
  • Page 11 Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
  • Page 12: 30Xq0660

    Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
  • Page 13: 30Xq0750

    Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
  • Page 14: 30Xq0745

    Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
  • Page 15: 30Xq0810

    Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
  • Page 16: 30Xq0910/1002

    Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
  • Page 17: 30Xq1035/1102

    Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. 3.10 - 30XQ1150/1200/1230 Carrier Yileng - Shanghai, China...
  • Page 18: 30Xq1300/1340/1370/1400/1450/1502

    Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. 3.11 - 30XQ1300/1340/1370/1400/1450/1502 Carrier Yileng - Shanghai, China...
  • Page 19: Multiple Chiller Installation

    For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. 3.12 - Multiple chiller installation NOTE: If the walls are higher than 2 m, contact the factory. Carrier Yileng - Shanghai, China...
  • Page 20: 4- Physical And Electrical Data For 30Xq Units

    Circuit A Circuit B Circuit C Circuit D Air heat exchanger Cu-Al heat exchanger Fans Axial Flying Bird IV with rotating shroud Quantity Total air flow 54168 63196 63196 72224 72224 81252 81252 Fan speed Carrier Yileng - Shanghai, China...
  • Page 21: 30Xq1150-1502 Physical Data

    Fan speed Water heat exchanger Flooded multi-pipe Water content Max. water-side pressure w/o 1000 1000 1000 1000 1000 1000 1000 1000 1000 hydronic module Notes: Unit sizes 30XQ1150 to 1502 are supplied in two field-assembled modules. Carrier Yileng - Shanghai, China...
  • Page 22: Electrical Data

    Nominal power supply 400V-3Ph-50Hz Start-ip method Star-delta start Control power supply 24V via internal transformer Fan and control power 34.0 34.0 34.0 40.8 40.8 40.8 40.8 40.8 40.8 Nominal unit current draw, Circuit A+B Circuit C+D Carrier Yileng - Shanghai, China...
  • Page 23: Short-Circuit Stability Current For All Units

    LRYA - Locked rotor current for star connection LRDA - Locked rotor current for delta connection 4.7 - Compressor usage per circuit (A, B, C, D) 30XQ 压缩机 1002 1035 1102 06TSA155 06TSA186 06TTA266 06TTA301 06TTA356 06TUA483 Carrier Yileng - Shanghai, China...
  • Page 24 06TUA554 06TVA680 06TVA753 06TVA819 30XQ 压缩机 1150 1200 1230 1300 1340 1370 1400 1450 1502 06TSA155 06TSA186 06TTA266 06TTA301 06TTA356 06TUA483 06TUA554 06TVA680 06TVA753 06TVA819 Carrier Yileng - Shanghai, China...
  • Page 25: Electrical Connection

    • All connections to the system and the electrical installations must be in full accordance with all applicable local codes. • The Carrier 30XQ units are designed and built to ensure conformance with these codes. The recommendations of European standard EN 60 204-1 (Corresponds to IEC 60204-1) (machine safety - electrical machine components part 1: general regulations) are specifically taken into account, when designing the electrical equipment.
  • Page 26: Recommended Wire Sections

    NOTE: If particular aspects of an actual installation do not conform to the conditions described above, or if there are other conditions which should be considered, always contact your local Carrier representative. * The required protection level for this class is IP43BW (according to reference document IEC 60529). All 30XQ units are protected to IP44CW and fulfil this protection condition.
  • Page 27: Power Cable Entry

    • Heat reclaim condenser pump control (option) • Hot water valve control (option) • Set point reset via outside air temperature sensor reset • Various interlocks on the Energy Management Module (EMM) board (accessory or option) Carrier Yileng - Shanghai, China...
  • Page 28: Application Data

    Below 0° C air temperature the unit must either be equipped with the evaporator frost protection option (41A or 41B), or the water loop must be protected against frost by using a frost protection solution by the installer Carrier Yileng - Shanghai, China...
  • Page 29: Minimum Chilled Water Flow (Units Without Hydraulic Module)

    If the flow rate changes more rapidly, the system should contain a minimum of 6.5 liters of water per kW instead of 3.5 l/kW. 6.6 - System minimum water volume For better control of leaving water temperature, the water loop minimum capacity is given by the formula: Capacity = CAP (kW) × N Liters Carrier Yileng - Shanghai, China...
  • Page 30: Evaporator Water Flow Rate

    A/B,30XQ1400 Module B,30XQ1450 Module B 67.1 30XQ745 , 30XQ750 , 30XQ810 , 30XQ1230 Module A ,30XQ1400 Module A ,30XQ1450 59.0 Module A,30XQ1502 Module A/B 54.0 30XQ910, 30XQ1002,30XQ1035, 30XQ1102 *maximum flow corresponding 100kPa water pressure drop Carrier Yileng - Shanghai, China...
  • Page 31: Evaporator Pressure Drop Curve

    Water flow l/s ① 30XQ330 ② 30XQ430 ③ 30XQ502 ④ 30XQ670/702 ⑤ 30XQ745 Duplex, 30XQ 1150 1200 1230 1300 1340 1370 1400 1450 1502 Module B+A 502+670 502+702 502+745 625+670 670+670 670+702. 670+745 702+745. 745+745 Carrier Yileng - Shanghai, China...
  • Page 32 ① ② water flow l/s ① 30XQ660 ② 30XQ750 ② ① 水流量 l/s ① 30XQ810 ② 30XQ910/1002/1035/1102 Carrier Yileng - Shanghai, China...
  • Page 33: Water Connections

    • Before any start-up verify that the heat exchange fluid is compatible with the materials and the water circuit coating. In case additives or other fluids than those recommended by Carrier are used, ensure that the fluids are not considered as a gas, and that they belong to class 2, as defined in directive 97/23/EC.
  • Page 34 Please make the daily inspection of pressure gauge and sound of the water system. If there is pressure fluctuation or abnormal noise, the air should be eliminated by the air vent. Carrier Yileng - Shanghai, China...
  • Page 35: Victaulic Water Connections

    9 Hydraulic module defrost heater (option) 10 Air vent (evaporator) 11 Water drain (evaporator) 12 Expansion compensator (flexible connections) 13 Flow switch 14 Water temperature sensor 15 Air vent 16 Flexible connection 17 Shut-off valve 18 Charge valve Carrier Yileng - Shanghai, China...
  • Page 36: Flow Control

    The water flow switch is installed on the evaporator water inlet and adjusted by the control, based on unit size and application. If adjustment is necessary, it must be carried out by qualified personnel trained by Carrier Service. Terminals 34 and 35 are provided for field installation of the chilled water pump interlock (auxiliary contact for pump operation to be wired on site).
  • Page 37: Operation Of Two Units In Master/Slave Mode

    30XQ with master/slave control configuration (note: entering water control point only) 8- MAJOR SYSTEM COMPONENTS AND OPERATION DATA 8.1 Direct-drive twin-screw compressor with variable capacity slide valve • 30XQ units use 06T geared twin-screw compressors equipped with a variable capacity slide valve for Carrier Yileng - Shanghai, China...
  • Page 38: Pressure Vessels

    The 30XQ air-cooled heat pump chiller operating only with refrigerant R-134a. 8.1.3 - Lubricant The 06T screw compressor is approved for use with the following lubricant CARRIER MATERIAL SPEC PP 47-32. 8.1.4 - Oil supply solenoid valve An oil supply solenoid valve is installed on the oil return line as standard to isolate the compressor from oil flow when the compressor is not operating.
  • Page 39 The products that may be added for thermal insulation of the vessels during the water piping connection procedure must be chemically neutral in relation to the materials and coatings to which they are applied. This is also the case for the products originally supplied by Carrier. 8.2.3 - Economizer function The economizer function includes a liquid line valve, a filter drier, two EXVs, a plate heat exchanger as well as protection devices (fuse or valve).
  • Page 40: High-Pressure Safety Switch

    Warning: to ensure valve reliable work, it will be better keep power on when unit is stopped, especially operates at cooling mode and defrost mode. If it has to cut off power to examine and repair, please check and verify the Carrier Yileng - Shanghai, China...
  • Page 41: Options And Accessories

    • Air heat exchanger (condenser) cleaning - see chapter “Condenser coil - level 1” • Check for removed protection devices, and badly closed doors/covers • Check the unit alarm report when the unit does not work (see report in the 30XA Pro-Dialog Plus control manual). Carrier Yileng - Shanghai, China...
  • Page 42: Level 2 Maintenance (See Note)

    NOTE: Any deviation or non-observation of these maintenance criteria will render the guarantee conditions for the HVAC unit nul and void, and the manufacturer, Carrier will no longer be held responsible. 10.4 - Tightening torques for the main electrical connections...
  • Page 43: Tightening Torques For The Main Bolts And Screws

    For coils installed in a coastal or industrial environment periodical cleaning by rinsing with water is beneficial. It is however essential that rinsing is done with a low-speed water jet to avoid damaging the fins. Monthly cleaning as described below is recommended. ATTENTION Carrier Yileng - Shanghai, China...
  • Page 44: Evaporator Maintenance

    2 bar. The filter should be replaced at least once per year. The pressure drop across the filter can be determined by measuring the pressure at the filter service port and the oil Carrier Yileng - Shanghai, China...
  • Page 45: Precaution For Compressor Power Supply Bus Bar Connection

    The switch that has been selected for detecting reverse rotation is Carrier part number HK01CB001. This switch opens the contacts when the pressure falls below 7 kPa. The switch is a manual reset type that can be reset after the pressure has once again risen above 70 kPa. It is critical that the switch be a manual reset type to preclude the compressor from short cycling in the reverse direction.
  • Page 46: Start-Up Check List For 30Xq Heat Pump Chillers (Use For Job File)

    □Inlet piping to cooler includes a 20 mesh strainer with a mesh size of 1.2 mm. □ condenser/ cooling Water quality should meet with Carrier requirements about heat exchanger water quality. The compressor flange has been removed. Carrier Yileng - Shanghai, China...
  • Page 47 WARNING: Operation of the chiller with an improper supply voltage or excessive phase imbalance constitutes abuse which will invalidate the Carrier warranty. If the phase imbalance exceeds 2% for voltage, or 10% for current, contact your local electricity supply at once and ensure that the chiller is not switched on until corrective measures have been taken.
  • Page 49 Version: IOM_30XQ_E-1301_003 Supersede: IOM_30XQ_E-1203_002 Effective Data: Aug 2017...

Table of Contents