If damage is detected upon receipt, immediately file a claim with the shipping company. Carrier strongly recommends employing a specialized company to unload the machine. Do not remove the skid or the packaging until the unit is in its final position. These units can be moved with a fork lift truck, as long as the forks are positioned in the right place and direction on the unit.
Only charge liquid refrigerant R-134a at the liquid line. Ensure that you are using the correct refrigerant type before recharging the unit. Charging any refrigerant other than the original charge type (R-134a) will impair machine operation and can even lead to Carrier Yileng - Shanghai, China...
Page 6
Periodically inspect all valves, fittings and pipes of the refrigerant and hydronic circuits to ensure that they do not show any corrosion or any signs of leaks. It is recommended to wear ear defenders, when working near the unit and the unit is in operation. Carrier Yileng - Shanghai, China...
Typical applications of these units are in refrigeration systems, and they do not require earthquake resistance. Earthquake resistance has not been verified. If the unit is ordered with the vibration damper kit, please observe the safety and installation notices in the kit installation instructions. Carrier Yileng - Shanghai, China...
Page 8
• Check the protection of moving parts. • Verify the accessibility for maintenance or repair and to check the piping. • Verify the status of the valves. • Verify the quality of the thermal insulation and of the vapour barriers. Carrier Yileng - Shanghai, China...
Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. 3.3 - 30XQ625/670/702 Carrier Yileng - Shanghai, China...
Page 11
Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. Carrier Yileng - Shanghai, China...
Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. 3.10 - 30XQ1150/1200/1230 Carrier Yileng - Shanghai, China...
Drawings are not contractually binding. Before designing an installation, consult the certified dimensional drawings supplied with the unit or available on request. For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. 3.11 - 30XQ1300/1340/1370/1400/1450/1502 Carrier Yileng - Shanghai, China...
For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to the dimensional drawings. 3.12 - Multiple chiller installation NOTE: If the walls are higher than 2 m, contact the factory. Carrier Yileng - Shanghai, China...
Circuit A Circuit B Circuit C Circuit D Air heat exchanger Cu-Al heat exchanger Fans Axial Flying Bird IV with rotating shroud Quantity Total air flow 54168 63196 63196 72224 72224 81252 81252 Fan speed Carrier Yileng - Shanghai, China...
Nominal power supply 400V-3Ph-50Hz Start-ip method Star-delta start Control power supply 24V via internal transformer Fan and control power 34.0 34.0 34.0 40.8 40.8 40.8 40.8 40.8 40.8 Nominal unit current draw, Circuit A+B Circuit C+D Carrier Yileng - Shanghai, China...
• All connections to the system and the electrical installations must be in full accordance with all applicable local codes. • The Carrier 30XQ units are designed and built to ensure conformance with these codes. The recommendations of European standard EN 60 204-1 (Corresponds to IEC 60204-1) (machine safety - electrical machine components part 1: general regulations) are specifically taken into account, when designing the electrical equipment.
NOTE: If particular aspects of an actual installation do not conform to the conditions described above, or if there are other conditions which should be considered, always contact your local Carrier representative. * The required protection level for this class is IP43BW (according to reference document IEC 60529). All 30XQ units are protected to IP44CW and fulfil this protection condition.
• Heat reclaim condenser pump control (option) • Hot water valve control (option) • Set point reset via outside air temperature sensor reset • Various interlocks on the Energy Management Module (EMM) board (accessory or option) Carrier Yileng - Shanghai, China...
Below 0° C air temperature the unit must either be equipped with the evaporator frost protection option (41A or 41B), or the water loop must be protected against frost by using a frost protection solution by the installer Carrier Yileng - Shanghai, China...
If the flow rate changes more rapidly, the system should contain a minimum of 6.5 liters of water per kW instead of 3.5 l/kW. 6.6 - System minimum water volume For better control of leaving water temperature, the water loop minimum capacity is given by the formula: Capacity = CAP (kW) × N Liters Carrier Yileng - Shanghai, China...
• Before any start-up verify that the heat exchange fluid is compatible with the materials and the water circuit coating. In case additives or other fluids than those recommended by Carrier are used, ensure that the fluids are not considered as a gas, and that they belong to class 2, as defined in directive 97/23/EC.
Page 34
Please make the daily inspection of pressure gauge and sound of the water system. If there is pressure fluctuation or abnormal noise, the air should be eliminated by the air vent. Carrier Yileng - Shanghai, China...
The water flow switch is installed on the evaporator water inlet and adjusted by the control, based on unit size and application. If adjustment is necessary, it must be carried out by qualified personnel trained by Carrier Service. Terminals 34 and 35 are provided for field installation of the chilled water pump interlock (auxiliary contact for pump operation to be wired on site).
30XQ with master/slave control configuration (note: entering water control point only) 8- MAJOR SYSTEM COMPONENTS AND OPERATION DATA 8.1 Direct-drive twin-screw compressor with variable capacity slide valve • 30XQ units use 06T geared twin-screw compressors equipped with a variable capacity slide valve for Carrier Yileng - Shanghai, China...
The 30XQ air-cooled heat pump chiller operating only with refrigerant R-134a. 8.1.3 - Lubricant The 06T screw compressor is approved for use with the following lubricant CARRIER MATERIAL SPEC PP 47-32. 8.1.4 - Oil supply solenoid valve An oil supply solenoid valve is installed on the oil return line as standard to isolate the compressor from oil flow when the compressor is not operating.
Page 39
The products that may be added for thermal insulation of the vessels during the water piping connection procedure must be chemically neutral in relation to the materials and coatings to which they are applied. This is also the case for the products originally supplied by Carrier. 8.2.3 - Economizer function The economizer function includes a liquid line valve, a filter drier, two EXVs, a plate heat exchanger as well as protection devices (fuse or valve).
Warning: to ensure valve reliable work, it will be better keep power on when unit is stopped, especially operates at cooling mode and defrost mode. If it has to cut off power to examine and repair, please check and verify the Carrier Yileng - Shanghai, China...
• Air heat exchanger (condenser) cleaning - see chapter “Condenser coil - level 1” • Check for removed protection devices, and badly closed doors/covers • Check the unit alarm report when the unit does not work (see report in the 30XA Pro-Dialog Plus control manual). Carrier Yileng - Shanghai, China...
NOTE: Any deviation or non-observation of these maintenance criteria will render the guarantee conditions for the HVAC unit nul and void, and the manufacturer, Carrier will no longer be held responsible. 10.4 - Tightening torques for the main electrical connections...
For coils installed in a coastal or industrial environment periodical cleaning by rinsing with water is beneficial. It is however essential that rinsing is done with a low-speed water jet to avoid damaging the fins. Monthly cleaning as described below is recommended. ATTENTION Carrier Yileng - Shanghai, China...
2 bar. The filter should be replaced at least once per year. The pressure drop across the filter can be determined by measuring the pressure at the filter service port and the oil Carrier Yileng - Shanghai, China...
The switch that has been selected for detecting reverse rotation is Carrier part number HK01CB001. This switch opens the contacts when the pressure falls below 7 kPa. The switch is a manual reset type that can be reset after the pressure has once again risen above 70 kPa. It is critical that the switch be a manual reset type to preclude the compressor from short cycling in the reverse direction.
□Inlet piping to cooler includes a 20 mesh strainer with a mesh size of 1.2 mm. □ condenser/ cooling Water quality should meet with Carrier requirements about heat exchanger water quality. The compressor flange has been removed. Carrier Yileng - Shanghai, China...
Page 47
WARNING: Operation of the chiller with an improper supply voltage or excessive phase imbalance constitutes abuse which will invalidate the Carrier warranty. If the phase imbalance exceeds 2% for voltage, or 10% for current, contact your local electricity supply at once and ensure that the chiller is not switched on until corrective measures have been taken.
Page 49
Version: IOM_30XQ_E-1301_003 Supersede: IOM_30XQ_E-1203_002 Effective Data: Aug 2017...