Check now the Event Log or in the spontaneous annunciations of the device where you are working:
Indication no. 3243
If the parameterization of the devices is consistent, i.e. the requirements have been observed when
setting the Functional Scope (Section
(2.1.3.1 Setting
Parameters (Section
pears, i.e. no. 3230
consistency check has thus been completed.
Availability of the Protection Data Interfaces
The quality of protection data transmission depends on the availability of the protection data interfaces and
the transmission. Therefore, check the statistic information of the device.
Check the following information:
Indication no. 7753
hour) indicate the availability of protection data interface 1. The value of no. 7753
a minimum availability of 99.85% after two minutes of operation. The value of no. 7754
attain a minimum availability of 99.85% after one hour of operation.
If these values are not attained, the protection communication should be checked.

Checking Circuit Breaker Failure Protection

3.3.7
General
If the device provides a breaker failure protection and if this is used, the integration of this protection function
in the system must be tested under practical conditions.
Due to the variety of application options and the available system configurations, it is not possible to make a
detailed description of the necessary tests. It is important to observe local conditions and protection and
system drawings.
Before starting the circuit breaker tests it is recommended to isolate the circuit breaker of the tested feeder at
both ends, i.e. line isolators and busbar isolators should be open so that the breaker can be operated without
risk.
!
CAUTION
Also for tests on the local circuit breaker of the feeder a trip command to the surrounding circuit breakers
can be issued for the busbar.
Non–observance of the following measure can result in minor personal injury or property damage.
Therefore, primarily it is recommended to interrupt the tripping commands to the adjacent (busbar)
²
breakers, e.g. by interrupting the corresponding pickup voltages.
Before the breaker is finally closed for normal operation, the trip command of the feeder protection routed to
the circuit breaker must be disconnected so that the trip command can only be initiated by the breaker failure
protection.
Although the following lists do not claim to be complete, they may also contain points which are to be ignored
in the current application.
Auxiliary Contacts of the CB
The circuit breaker auxiliary contact(s) form an essential part of the breaker failure protection system in case
they have been connected to the device. Make sure the correct assignment has been checked.
238
PDI FO con. to. (protection interface connected with).
2.1.1.2 Setting
Notes), the Power System Data 2
2.1.8.2 Setting
Notes), the fault indication for the verified interface also disap-
PDI FO faulty or no. 3232 PDI Cu faulty . The communication and
FO A/m (availability per minute) and indication no. 7754 FO A/h (availability per
Notes), the Power System Data 1
(2.1.6.1 Setting
Notes), the Protection Interface
SIPROTEC 4, 7SD80, Manual
E50417-G1100-C474-A2, Edition 02.2018
FO A/m should attain
FO A/h should

Advertisement

Table of Contents
loading

Table of Contents