GB
Example of the A6 SFE1C
1
Straightener.
2
Contact equipment, which consists of a contact tip, connector and flux tube.
3
Slide (motor--driven).
4
Motor and gearbox (A6 VEC).
5
Flux hopper (1 l).
Connection instructions for SAW and MIG/MAG welding appear from the system dia-
gram on page 69.
4
INSTALLATION
4.1
General
Installation shall only be performed by qualified personnel.
WARNING
Rotating parts can cause injury, take great care.
4.2
Mounting
The automatic welding machines can easily be fitted with 4 screws M10x40 on a
rail--borne carriage or on a column and boom unit.
4.3
Connections
1. The connection of the A2--A6 Process Controller (PEH) to the welding machine
shall be done according to the connection instructions in the A2--A6 Process
Controller (PEH) service manual.
For further information, see instruction manual for the A2--A6 Process Controller
(PEH).
ffa9d1ea
- - 68 - -