Download Print this page

Advertisement

Quick Links

A6 S Arc Master ICE™
Installation manual
0825 656 074 2012-06-01
Valid for serial no. 001-xxx-xxxx

Advertisement

loading
Need help?

Need help?

Do you have a question about the Arc Master ICE A6 S and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for ESAB Arc Master ICE A6 S

  • Page 1 A6 S Arc Master ICE™ Installation manual 0825 656 074 2012-06-01 Valid for serial no. 001-xxx-xxxx...
  • Page 2 ENGLISH ..........Rights reserved to alter specifications without notice.
  • Page 3: Table Of Contents

    ENGLISH SAFETY ............. INSTALLATION .
  • Page 4: Safety

    Full responsibility for safety measures in respect of personnel working on, or in the vicinity of, the system rests upon the user of the ESAB Welding Equipment. All safety measures must fulfil all regulations and mandatory rules which apply to the type of equipment concerned, in regard to the dangers and the level of hazard involved with the operation of any Welding Plant.
  • Page 5 SAFETY 7. Live parts are normally semi--protected. Control-- and connection boxes must not be opened while in operation, or if power is connected to the equipment. The above--mentioned boxes can be opened only with a key or a tool. Check that recommended, earthed connectors are properly fitted. Only authorised personnel may work on electrical equipment.
  • Page 6 SAFETY WARNING ARC WELDING AND CUTTING CAN BE INJURIOUS TO YOURSELF AND OTHERS. TAKE PRECAUTIONS WHEN WELDING. ASK FOR YOUR EMPLOYER’S SAFETY PRACTICES WHICH SHOULD BE BASED ON MANU- FACTURER’S HAZARD DATA. ELECTRIC SHOCK - - Can kill Install and earth the welding unit in accordance with applicable standards. Do not touch live electrical parts or electrodes with bare skin, wet gloves or wet clothing.
  • Page 7: Installation

    INSTALLATION INSTALLATION General The actual safety regulations must be followed precisely when measures with regard to the Installation/ Operation and Maintenance are taken! General safety regulations for the handling of the equipment can be found on page 4. Read through before you start using the equipment! Read the instruction manuals for the componets included in the equipment! - - 7 - -...
  • Page 8: Controll System Icet

    INSTALLATION Controll system ICEt Overview - - 8 - - hfd2i1ea...
  • Page 9: Connections On Control Box Pav

    INSTALLATION Connections on control box PAV Rear side - -PAV - - 9 - - hfd2i1ea...
  • Page 10 INSTALLATION Inside - - PAV - - 10 - - hfd2i1ea...
  • Page 11 INSTALLATION PAV settings 1. Node address: 14 2. Machine ID: 5 - - 11 - - hfd2i1ea...
  • Page 12: Connections On Control Box Pek

    INSTALLATION Connections on control box PEK Rear side - - PEK welding - - 12 - - hfd2i1ea...
  • Page 13 INSTALLATION Inside - - PEK - - 13 - - hfd2i1ea...
  • Page 14 INSTALLATION PEK Settings 1. Node address: 6 2. Machine ID: 5 - - 14 - - hfd2i1ea...
  • Page 15: Start--Up

    INSTALLATION Start- -up 1. Start the welding power sources and check that the welding head is working without PAV. 2. Change the software in PEK and in the power source, if needed load ICE licence. PEK: Node address: 6 Machine ID: 5 3.
  • Page 16 INSTALLATION 8. Turn the power off. Place the ribbon cable back in CN26. Note!: Do not switch the power on, while the ribbon cable is removed and installed in CN26. 9. Start the welding power sources and check that PEK finds all units. - - 16 - - hfd2i1ea...
  • Page 17 ESAB subsidiaries and representative offices Europe Asia/Pacific Representative offices NORWAY AS ESAB AUSTRIA BULGARIA CHINA Larvik ESAB Ges.m.b.H ESAB Representative Office Shanghai ESAB A/P Tel: +47 33 12 10 00 Vienna- -Liesing Sofia Shanghai Fax: +47 33 11 52 03...