Operation; General; Starting Work - ESAB A6 S Arc Master Instruction Manual

Table of Contents

Advertisement

GB
5

OPERATION

5.1

General

General safety regulations for the handling of the equipment can be found on
page 64. Read through before you start using the equipment!
Select wire type and flux or shielding gas so that the weld material is as close as
S
possible to the analysis of the base metal. Select wire size and welding data in
accordance with the values recommended by the welding materials supplier.
Thorough preparation of the weld surfaces is necessary to achieve a good weld.
S
NOTE! The width of the weld joint gap must be uniform.
To minimise the risk of heat crack formation, the width of the weld must be
S
greater than the penetration depth.
Always carry out a test weld with the same joint type and sheet thickness as the
S
production work piece.
For control and adjustment of the automatic welding machine and welding power
S
supply, see the instruction manual for the A2--A6 Process Controller (PEH).
For replacement of wear parts, see table on page 204.
S
5.2

Starting work

Loading the welding wire
Remove the wire drum (1) from the brake hub (2)
S
and take off the side plate (3).
Locate the wire reel on the wire drum (1).
S
Cut off the binding wires from around the
S
wire reel.
Fit the side plate (3).
S
Fit the wire drum (1) on the brake hub (2).
S
Check that the carrier (4) is in the correct position.
NOTE! The maximum angle for the wire bobbin is 25°.
At extreme angles, wear will occur on the brake hub locking
mechanism and the wire bobbin will slide off the brake hub.
WARNING
To prevent the reel sliding off the hub:
Lock the reel in place by turning the red knob as shown
S
on the warning label attached next to the hub.
ffa9d1ea
- - 70 - -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents