Download Print this page

Screen Innovations Nano Roll 275 Series Installation Instructions Manual page 8

24vdc - sdn

Advertisement

INSTALLATION - 24 VDC - SDN (375 / 475 SERIES)
INSTALLATION - 24 VDC - SDN (375 / 475 SERIES)
8. Make sure the motor head bracket is fully seated. Secure with cotter pin.
9. Put idler end cap over idler and snap into place.
There will be an audible click.
Installation - Nano Roll - 24VDC - SDN (375 / 475)
Pg 13
Installation - Nano Roll - 24VDC - SDN (375 / 475)
Pg 14

Advertisement

loading

This manual is also suitable for:

Nano roll 475 seriesNano roll 375 series